 |
|
|
IPPS 2010
|
Package testing often requires defined pressure sequences. The IPPS can be programmed with up to 99 different pressure sequences. The programming can be done by the user; special knowledge isn’t necessary.
Once programmed, the pressure sequences can be selected and activated. The duration of a sequence can vary from seconds to months. Repetitions are also possible. Additionally, the IPPS offers the possibility of pressure monitoring: If the actual pressure is out of specification limits, a warning is displayed.
Operation:
- The container to be tested is connected to one of the pressure output connectors.
- Pressure follows the programmed sequence.
- The IPPS in connection with the Steinfurth Closure Tester are the ideal, save environment for package testing.